Today, the Television Bureau of Advertising (TVB), the not-for-profit trade association of America’s commercial broadcast television industry, the National Highway Traffic Safety Administration (NHTSA), and the Ad Council launched their 11th year of “Project Roadblock: Local TV Puts the Brakes on Drunk Driving.” Launched in December 2003, Project Roadblock is the local broadcast television industry’s extension of NHTSA and the Ad Council’s ‘Buzzed Driving is Drunk Driving’ PSA campaign. Since then, the multi-media campaign has served as an opportunity for local television stations to combat drunk driving by donating on-air, online and mobile advertising time and space for the PSAs. To date, broadcast TV stations across the nation have donated more than $34 million in media to support this effort.
To view the Multimedia News Release, go to http://www.multivu.com/players/English/7391951-ad-council-tvb-nhtsa-partner-to-prevent-drunk-driving-fatalities-during-holidays/
https://youtu.be/gZKVPMI-p18 Email isn’t the most organized method for business communication. There are better alternatives that are more efficient. The problem with email is that it’s difficult to keep track of things. Project collaboration can easily result in one-hundred to two-hundred emails per day, thousands per week, and before you know it you’re spending three hours just looking for one attachment, you’re missing meetings, and you’re confused about the goals. Is there a better way? YES!
A historic day for AC Milan and Milan. Fondazione Fiera has decided that the winning project for the redevelopment of the old trade fair is the one of AC Milan. The decision made yesterday is the first step, but the dream of the Vice President and CEO Barbara Berlusconi to build a new stadium could soon become reality.
The project, which was presented along with Arup in January, envisions the construction of one of the most innovative stadiums in the world, open to the city and extremely functional. It will contain within itself a hotel, a school, restaurants, children’s playgrounds, walking paths in the green on the rooftop, exhibition space for young artists and other useful services to the citizens. The stadium will have about 50,000 seats and already many international companies are putting themselves forward for a commercial partnership.
To view the Multimedia News Release, go to http://www.multivu.com/players/uk/7572451-ac-milan-will-have-a-new-stadium/
https://exodraft-heatrecovery.com/about-heat-recovery/uk-heat-recovery-ihrs-funding/
Visit https://exodraft-heatrecovery.com
Did you know that your company can receive up to 50% government funding when installing an industrial heat recovery system?
The program is called IHRS – or Industrial Heat Recovery Scheme – and within the program, a total of £18 million are available for funding.
Of the £18 million, £6 million are earmarked for concept and design and £12 million are earmarked for installation, commissioning and monitoring.
A heat recovery project can receive funding at any stage – even at the consultant and analysis stage – all the way through to the final turn-key delivery.
Funding applications are graded on a 0-to-10 scale. The higher the score, the greater the funding potential.
In order to be eligible for funding, the heat recovery system must be installed on an existing installation.
The project as a whole is graded based on energy benefit, kilowatt savings as well as environmental, economic and social impact and must achieve a minimum score of 5.
It is a requirement that the recovered energy is used within the confines of the business.
The Egyptian Ministry of Antiquities is pleased to announce the launch of an egyptian – international Project using non-invasive and non-destructive surveying techniques for the scanning of Egyptian Pyramids under the title “ScanPyramids” project.
Just because a mystery is 4500 years old doesn’t mean it can’t be solved…” This could be the motto of the exceptional scientific mission launched October 25, 2015, under the authority of the Egyptian Ministry of Antiquities, initiated, designed and coordinated by the Faculty of Engineering of Cairo and the French HIP.Institute (Heritage, Innovation and Preservation). Radiographic muons, aka cosmic particles, infrared thermography, photogrammetry, scanner and 3D reconstruction: the most innovative technologies will be used by researchers of international renown and three major universities: the Faculty of Engineering of Cairo University, Université Laval of Quebec and Nagoya University of Japan. Their goal: to probe the heart of the largest pyramids of Egypt, without drilling the slightest opening.
Four millennia after their construction, these ancient giants are far from having yielded their secrets. The first mystery concerns their construction, especially Khufu, the last of the Seven Wonders of the Ancient World still existing: it is still impossible to describe with certainty how this stone monument, the largest ever built by humans, was erected.
The “ScanPyramids” project has already been approved by the permanent committee of the Ministry of Antiquities and has obtained all necessary permissions from concerned authorities. With a base of more than 5 hectares, its original height of almost 150 meters and a mass of 5 million tons, how was it possible to construct such a wonder in only 25 years?
To view the multimedia release go to:
http://www.multivu.com/players/uk/7671551-scanpyramids-project-launch-egyptian/
Kiehl’s Since 1851, the New York-based purveyor of fine quality skin and hair care, continues its enduring support of HIV/AIDS charities with its seventh annual Kiehl’s LifeRide for amfAR, an 11-day charity motorcycle ride.
On August 3rd, LifeRide commenced with contemporary artist José Parlá, in partnership with RxArt, with an unveiling of original work by Parlá at Incarnation Children’s Center (ICC). ICC is New York City’s only skilled nursing facility providing specialized care for youth living with HIV/AIDS.
To view the multimedia release go to:
http://www.multivu.com/players/English/7896051-kiehls-liferide-amfar/